The short answer: When you’re selling a home in Sewall’s Point, FL, start with the Town, not the County. Order the Town’s open-permit and code-lien search, confirm whether your street has sewer or you’re still on septic, and gather the Town permits for your dock, dock roof and seawall. Then clean up the yard without cutting trees.
By Jeremy Beckham, REALTOR®, SFR | Last updated: November 12, 2026
Sewall’s Point is the narrow peninsula between the St. Lucie River and the Indian River Lagoon, just across the bridge from Stuart. It has been its own town since 1957, with its own Town Hall, its own police department and its own Building Department at 1 South Sewall’s Point Road. That Building Department is what makes selling here different from unincorporated Martin County. For the area itself, see my Sewall’s Point area guide and my Stuart area guide.
Most of the questions I field on a Sewall’s Point listing are Town questions. Was the dock roof permitted? Is the house on sewer yet? Can the buyer rent it out? Can we take down that tree that’s blocking the river view in the photos? Answer those before you list.
For the general Florida items (roof age, the 4-point inspection, wind mitigation, staging and the state flood disclosure), start with my Stuart seller prep checklist. HOA estoppels and the HOA disclosure summary are covered in my Tradition seller guide. Martin County septic records and state dock permits are in my Palm City seller guide. This post sticks to Sewall’s Point, and every rule and number comes from a source listed at the bottom.
Key takeaways
- The Town runs its own open-permit and code-violation search. You request it by email through the Town Clerk, and the Town says it answers in 3 to 5 business days.
- Sewer depends on the street. Martin County’s standard grinder price is $10,000, or $8,000 within 365 days of the force main becoming available, and WQCS reported Sewall’s Point connections at $8,000 to $12,000.
- Dock roofs can’t sit higher than the finished grade of the upland lot. The Town’s 2022 amnesty window for unpermitted dock roofs closed December 1, 2022.
- Removing any tree 2 inches or more in caliper needs a Town permit, and heavy “hat rack” trimming counts as removal.
- Rentals under 180 days aren’t allowed, and a Town rental permit doesn’t transfer to the next owner.
Sewall’s Point seller checklist at a glance
| What to check | Where to look | Why a buyer cares |
|---|---|---|
| Open or expired permits, code violations | Town Clerk lien search (3 to 5 business days) | Title and lender questions |
| Permit history after April 20, 2015 | Town’s online permitting portal (Citizenserve) | Proves the work was finaled |
| Permit files before April 20, 2015 | Town website archive, or paper files at Town Hall | Older additions, docks, pools |
| Sewer or septic | Martin County Utilities and your availability letter | Hookup cost and septic condition |
| Dock, lift, dock roof | Town dock permit plus state (FDEP) authorization | Unpermitted roofs are a known issue here |
| Seawall or rip rap | Town permit, FDEP/Army Corps authorization, recent survey | Repairs are expensive and permitted |
| Trees | Town tree permit before any removal | Fines, and a mad neighbor |
| Rentals | Town rental permit (not transferable) | Investor buyers ask first |
| Flood zone and road elevation | Martin County flood map and Town FEMA page | Insurance quotes and king-tide flooding |
How do I find open permits and code liens in Sewall’s Point?
Start with the Town. Order the Town Clerk’s search for open or expired permits and code violations, then pull your permit history from the Town’s online system and older files. Your title company runs its own searches, but I’d rather know about an open permit three weeks before we list than three days before we close.
Per the Town’s lien search page, the request goes by email on company letterhead, and the Town answers in 3 to 5 business days, not counting the day it’s received. I order this one for my sellers so it’s in hand before photos.
Then pull the permit history:
- Permits issued after April 20, 2015 live in the Town’s online permitting system (Citizenserve), which you reach from the Building Department page.
- Permits before April 20, 2015 are being scanned onto the Town website. If your street or address isn’t there yet, the Town says to call Town Hall at 772-287-2455, ext. 10, to schedule a look at the paper file. Blueprints and surveys are viewed at Town Hall.
Older homes here have often been added onto more than once, and an addition with no final inspection is what a buyer’s lender or insurer will catch. Close it out while you control the timeline.
Is my Sewall’s Point home on sewer or still on septic?
It depends on your street. Parts of South Sewall’s Point have grinder sewer through Town and County phases, Rio Vista has its own gravity system, and other streets are still on septic. It’s the question I get most, so check with Martin County Utilities, look for a connection availability letter, and ask the Town where your street stands.
In 2022 the Town took on a septic-to-sewer conversion for South Sewall’s Point with an $8.4 million state (FDEP) resilience grant, according to Town staff quoted by WQCS public radio. Here’s what the public record shows so far:
- Two interlocal agreements with Martin County covered 169 and then 171 grinder connections, 340 parcels in low-lying areas. The second one, for the South Sewall’s Point force main extension, went to the County Commission in April 2025 (Martin County file 25-0732).
- 134 more grinder connections were approved by the County Commission on a 3-2 vote in late 2025, past the County’s usual limit on grinder systems, as WQCS reported.
- Rio Vista is a different system. The Town bid relining and rebuilding of the existing dry gravity sewer lines there in December 2025, with final completion set for June 15, 2026, then bid private-lot gravity service work (due July 16, 2026), per the Town’s bids page. Ask the Town about current status.
- Other areas may come later. The Rio Vista bid notice lists areas the Town may add, including Sewall’s Meadow, Ridgeland, Hillcrest, Oakwood Drive, Riverview Drive and Pineapple Lane. Ask the Town where your street stands.
According to the WQCS report, hooking up in the grinder areas isn’t mandatory unless your septic system fails. That’s good news for a seller, but it also means buyers will ask why you haven’t connected.
What a connection costs
Martin County’s Connect to Protect page lists a standard price of $10,000 for a County-installed residential grinder system where a new force main has been built. If you connect within 365 days of the force main becoming available, it drops to an $8,000 lump sum. WQCS reported Sewall’s Point connections at $8,000 to $12,000, so confirm your number with Martin County Utilities. After hookup, expect a monthly sewer charge of about $18 on the water bill plus a usage charge. With a grinder, the County maintains the pump, tank and control panel, and you own the plumbing from the house to the tank and the electricity that runs it.
How I handle it in a listing
Find your availability letter. The $8,000 window runs 365 days from when the force main became available, and the County mails that letter when construction is done, so it’s the best record of the date. If you’re inside that window, that’s a selling point, because a buyer can still lock in the lower price. If you’ve already connected, put the paid receipt and the septic abandonment paperwork in the file. If you’re still on septic, have recent pump-out and inspection records ready. If your street isn’t in any phase yet, say so plainly.
What do I need to show for my dock, lift and dock roof?
Show the Town permit and the state FDEP authorization for the dock, any boat lift and any roof over the dock. On a waterfront listing here, that file matters as much as the kitchen. If a roof was never permitted, or sits higher than the finished grade of your lot, talk to the Building Department before you list.
For new or rebuilt docks, the Town’s dock permit checklist asks for a state FDEP permit, letter of consent or exemption, engineered drawings, and a current mean-high-water survey. That survey has to show distances to the riparian lines (25 feet minimum) and to the nearest neighboring dock, piling or lift (50 feet minimum). The terminal platform can’t be bigger than 200 square feet, and the dock has to have your house number at the end.
Dock roofs get their own attention here. In 2022 the Town adopted Ordinance 442 after finding that some dock roofs had gone up without permits or were taller than the code allows. Under Section 62-175(1), a dock roof can’t sit higher than the finished grade of the upland lot. Owners of noncompliant roofs that existed as of June 1, 2022, had until December 1, 2022, to apply for a special permit, which meant showing FDEP compliance, paying a $500 fine plus a fee, and passing an inspection. Every other dock roof has to meet the permit rules and the height limit.
If your roof got a 2022 special permit, or your dock is legally nonconforming, put that paperwork in the file. If a roof never got permitted, a talk with the Building Department now is a much easier conversation than one with a buyer’s attorney in the middle of the inspection period.
Do I need a permit for seawall or shoreline work before I sell?
Only if you’re doing work on the wall. The Town’s checklist covers building and repairing walls, not selling a home. If your seawall is sound, gather the permits from when it was built or last repaired. If you plan repairs before listing, start early, because the Town and state approvals take time.
For wall work, the Town’s seawall, retaining wall and rip rap checklist requires FDEP authorization (and Army Corps approval when needed) for any seawall, or any retaining wall within 20 feet of mean high water. It also needs a survey no more than 5 years old, engineered drawings, and a final tie-in survey before the last inspection. Work valued at $5,000 or more needs a recorded Notice of Commencement before the first inspection.
One Town rule surprises a lot of sellers. When a wall is built or rebuilt, Section 82-397 requires walls within 100 feet of mean high water that can be seen from either river or from neighboring lots to be at least 50 percent screened by vegetation, and walls within 20 feet of the water that don’t sit at the water’s edge to be screened with native shoreline plants. If you’re repairing or rebuilding a wall to sell, budget for the planting too.
Can I trim or take down trees before I list?
Not without calling the Town first. The Town’s newcomer information says you need a permit to remove or relocate any tree with a caliper of 2 inches or more, measured four feet above the ground. Heavy trimming, which the Town calls “hat racking,” counts as removal.
Sewall’s Point has been a Tree City since 1990 and runs a Heritage Tree program for its biggest and oldest trees. The Town says permit fees are nominal and the penalties for skipping the permit are severe.
I get it. A big oak in front of the river view makes for a tough photo. But a tree violation found mid-sale is far worse than a partly blocked view, so get the permit first and let your photographer work around what stays.
Which Town rules show up in listing photos?
Boats, big trucks, street parking, contractor hours and noxious plants show up in nearly every listing I shoot here, according to the Town’s top code enforcement issues and newcomer pages. Sort them out before the photographer comes, because a buyer’s agent who knows the Town will spot them:
- Boats must be completely concealed from view, so a boat on a trailer in the driveway is a code issue, not just a staging issue.
- Trucks over 8,000 pounds net weight must be garaged or fully concealed. The Town’s two code pages word this rule a little differently, so check the current Code.
- No overnight parking on streets or rights-of-way.
- Contractor hours are 8 a.m. to 5 p.m., Monday through Saturday, with no contractor work on New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving or Christmas. Plan pre-listing repairs around that.
- Noxious plants like Brazilian pepper, melaleuca, Australian pine and carrotwood are prohibited, with limited exceptions.
Can a buyer rent out a Sewall’s Point home?
Only long-term. The Town says short-term rentals of less than 180 days aren’t allowed, so vacation-rental income isn’t part of the deal for any buyer. Renting a home here takes a Town rental permit, and the Town’s rental application packet spells out the rest:
- The permit isn’t transferable to another person or address. A buyer who wants to rent the home applies for their own.
- The owner, or a local responsible party who lives in Martin County, has to be reachable 24 hours a day, 7 days a week.
- Within 10 days of a lease starting, the owner files a Notice of Tenant form and a copy of the lease with the Town.
If your home is rented now, give me the lease, the Town permit and the Notice of Tenant filing.
Is my Sewall’s Point home in a flood zone?
Check before you list. The Town’s road project exists because South Sewall’s Point Road floods at king tide. Look up your parcel on the FEMA flood zone map, which the Town links from its town maps page, and have your elevation certificate ready if you have one.
The Town takes part in the National Flood Insurance Program, and its FEMA page names the Evans Crary Bridge to Monterey Road as the evacuation route for residents south of A1A. Ask your insurance agent whether a Community Rating System discount currently applies. FEMA’s published CRS list is the authority.
The Town is also raising South Sewall’s Point Road, the main road out for the south end:
- A March 12, 2026, FEMA and state public notice describes Phase II drainage work on South Sewall’s Point Road and Pineapple Lane to Henry Sewall Way. The plan raises the road above the 25-year storm elevation and above high king tide elevations, with stormwater treatment before water reaches the lagoon.
- The Town bid a Phase 2 section from Henry Sewall’s Way north to Oakwood Drive in late 2025.
- Phase 3 was awarded state Resilient Florida funding on a project listed at about $4.37 million (FY 2021-22 awards).
If your street has been raised, or is next on the list, a buyer worried about king tides will want to hear that. If water has ever reached your house or garage, it belongs on the state flood disclosure, which I cover in the Stuart post.
When should you start getting a Sewall’s Point home ready?
Give yourself six to eight weeks. The lien search alone takes up to a week. A dock-roof or seawall permit question can take longer, and a sewer hookup has to be scheduled with the County’s contractor. Start with the Town searches, sort out sewer and the waterfront permits, then handle trees, code items and staging.
Price comes after that, using recent Sewall’s Point sales, not Stuart averages.
Want a feel for what the move costs? Read what sellers pay at closing in Florida, what happens after you accept an offer, and whether you’ll lose your Save Our Homes benefit when you sell in Martin County. Utility contacts for the area are on my utilities by county and city page.
Frequently asked questions
Is my Sewall’s Point home on sewer or septic?
It depends on the street. South Sewall’s Point has been getting grinder sewer in phases, and the Town bid gravity sewer work in Rio Vista. Other areas, including Sewall’s Meadow, Ridgeland and Hillcrest, were listed as possible later additions. Ask the Town where your street stands, check with Martin County Utilities, and look for a connection availability letter.
Are short-term rentals allowed in Sewall’s Point?
No. The Town says rentals of less than 180 days aren’t allowed, and any rental needs a Town rental permit. That permit isn’t transferable, so a buyer who wants to rent the home applies for their own. Investors should plan on long-term leases only and leave vacation-rental income out of their numbers.
Does a Sewall’s Point rental permit transfer to the buyer?
No. The Town’s rental packet says the permit can’t be transferred or assigned to another person or address. A buyer who plans to rent applies for a new permit, names a local responsible party, and files the lease with the Town.
Can I remove a tree before listing my Sewall’s Point home?
Only with a Town permit if the tree is 2 inches or more in caliper, measured four feet above the soil. Heavy trimming counts as removal. The Town says penalties are severe, so call the Building Department before any tree work.
What if my dock roof was never permitted?
Talk to the Town Building Department before you list. The 2022 special permit window under Ordinance 442 closed December 1, 2022, and dock roofs now have to meet the permit rules and the height limit. A buyer’s inspector or attorney will likely ask about it.
How long does a Sewall’s Point lien search take?
The Town says 3 to 5 business days, not counting the day it receives the request, which goes by email on company letterhead. The search covers only Town code enforcement and open or expired permits. For the complete record of liens and assessments, contact the Martin County Clerk of the Circuit Court.
Is South Sewall’s Point Road being raised?
Yes, in phases. A March 2026 FEMA and state notice describes raising the road above the 25-year storm and high king tide elevations, from South Sewall’s Point Road and Pineapple Lane to Henry Sewall Way. Other phases run north toward Oakwood Drive.
Ready to sell in Sewall’s Point?
I’ll order your Town lien search, check your sewer status, gather your dock and seawall permits, and tell you what a buyer’s agent will ask before you spend a dollar on photos. Then we’ll price it from recent Sewall’s Point sales. Call or text me at 772.475.5371.
Browsing homes in Sewall’s Point? See my Sewall’s Point homes for sale page.
About the author
Jeremy Beckham, REALTOR®/SFR with NextHome Treasure Coast, 17 years helping buyers and sellers from Fort Pierce and Port St. Lucie south through Martin County and the Palm Beaches. His office is at 414 S Colorado Ave in Stuart. See how I source my numbers, my Port Salerno seller guide, my Jensen Beach seller guide, or my seller services.
This post is general information, not legal, engineering or insurance advice. Town rules, utility projects and costs change. Confirm details with the Town of Sewall’s Point, Martin County Utilities, your insurer and a Florida real estate attorney.
Sources
- Town of Sewall’s Point, Get a Lien Search (email request on letterhead, 3 to 5 business days)
- Town of Sewall’s Point, Building & Public Works and Building Permit Files Prior to April 20, 2015
- Town of Sewall’s Point Building Department, Dock Permit Application and Checklist (updated January 1, 2024)
- Town of Sewall’s Point Building Department, Seawall, Retaining Wall or Rip Rap Permit Checklist (includes Sec. 82-397, Ord. No. 376)
- Town of Sewall’s Point, Ordinance No. 442 (Sec. 62-152, special permits for certain dock roofs existing as of June 1, 2022)
- Town of Sewall’s Point, New Resident Information (chartered 1957, tree permits, boats, trucks, parking, construction hours) and Heritage Tree Program (Tree City since 1990)
- Town of Sewall’s Point, Top Code Enforcement Issues (short-term rentals under 180 days not allowed, noxious plants)
- Town of Sewall’s Point, Rental of Dwelling Permit Application packet
- Town of Sewall’s Point, FEMA / NFIP information (NFIP participation, evacuation routes) and Town Maps (FEMA flood zone map link, zoning map)
- Town of Sewall’s Point, Bids / RFP / RFQ / ITB (Rio Vista gravity sewer, private-lot gravity services, South Sewall’s Point Road phases) and Rio Vista gravity sewer bid notice (completion by June 15, 2026; areas the Town may add)
- FEMA and Florida Division of Emergency Management, Joint Public Notice, HMGP-4468-002-R, South Sewall’s Point Road Drainage Phase II, March 12, 2026
- Florida DEP, Resilient Florida Grant Program FY 2021-22 Awards (South Sewall’s Point Road Phase 3)
- Martin County Board of County Commissioners, File 25-0732, Interlocal Agreement for the South Sewall’s Point Force Main Extension Project, Phase II (April 22, 2025 agenda; about 171 connections)
- FEMA, Community Rating System (current CRS eligible communities list)
- Martin County, Connect to Protect (standard grinder price $10,000, or $8,000 within 365 days of force main availability; about $18 a month plus usage; owner and County responsibilities)
- WQCS (public radio, Fort Pierce), Sewall’s Point septic-to-sewer conversion moves forward despite divided commission vote, December 1, 2025 ($8.4 million FDEP grant, 340 grinder parcels, 134 more approved 3-2, connections $8,000 to $12,000, connection not mandatory unless a system fails)
Featured photo: The Ernest Lyons Bridge (A1A) over the Indian River Lagoon at Sewall’s Point, by AdamFirst at English Wikipedia, via Wikimedia Commons. Public domain.

